Stackable All-on-4: Guided Full-Arch Protocol (Mandible)

298,87 RON

This material gives you an unfiltered clinical perspective on the procedure Stackable All-on-4, a full-arch rehabilitation protocol based on high-precision guided surgery. The recording is designed to guide you through all the critical stages, giving you the confidence needed to integrate these complex solutions into your daily practice.

Clinical Focus: Total Control and Predictability

The session is dedicated to the dynamic visualization of the stackable components. Dr. Bogdan Chiper narrates in real time each surgical gesture, so that you understand not only the technique, but also the decision logic behind each maneuver.

Your clinical gain:

  • Post-operative safety: You learn the protocol for checking clot stability before finishing the procedure.
  • Surgical efficiency: You reduce stress and operating time through a rigorous digital workflow, where human error is eliminated through mechanical guidance.
  • Immediate Validation: You understand the importance of control imaging done “chairside”, which allows you to correct any detail while the patient is still in the room.

Structure of the Procedure (Clinical Stages & Bogdan's Steps)

You will follow a complete surgical path, segmented into the key moments of the protocol:

  1. Case Analysis and Digital Planning: Justification of implant positioning in relation to the mandibular bone availability.
  2. Securing the Stackable System: Technique for anchoring the base guide (Base Guide) with pins, to guarantee the stability of the entire sequence.
  3. Reduction Osteotomy: Use of the dedicated guide for precise leveling of the ridge and creation of the optimal prosthetic space.
  4. Guided Implant Placement: Sequential drilling protocol and real-time monitoring of primary stability.
  5. Multi-Unit Abutment Management: Selection and positioning of prosthetic components for a passive fit.
  6. “Horizontal Mattress” Suture: Specific suturing technique around the abutments to ensure perfect peri-implant healing.
  7. Final Control Protocol: Checking the flap margins for clot stability and residual bleeding – “Everything must be under control before the end”.
  8. Imaging Validation: Taking the control radiograph immediately to confirm the success of the procedure.

 

Key Takeaways for your evolution

  • Component Synchronization: You will understand the dynamics between the reduction guide, the placement guide and the prosthetic guide.
  • Bleeding Management: You acquire the rigor of the final check; if it bleeds, the clot is not stable and we intervene with an additional suture.
  • Communication in the Surgical Team: You observe the interaction with the assistants and support team for a workflow without hiccups.

“Total, final control is the only path to predictability. We do not finish the procedure when the last implant is placed, but when we are sure that every detail is under control.  Dr. Bogdan Chiper

 

Technical Details

  • Mentor: Dr. Bogdan Chiper
  • Procedure title: Stackable All-on-4 (Mandibular Arch)
  • Format: Narrated Live Op / Digital Mentorship